Change Request Form
| Property | Value |
|---|---|
| Document ID | TPL-004 |
| Version | 1.0 |
| Status | Draft |
| Owner | IT Operations Manager |
| Last Updated | 2026-01-11 |
| Next Review | 2027-01-11 |
| Related Controls | SOC 2: CC8.1 / ISO 27001: A.8.32 |
1. Purpose
This form documents change requests for information systems, ensuring proper authorization, testing, and approval before implementation. All production changes must be documented using this form or equivalent ticketing system.
2. When to Use
Use this form for:
- Application deployments
- Infrastructure changes
- Configuration changes
- Database changes
- Network changes
- Security changes
- Emergency changes (post-approval)
3. Change Request Form
Section A: Change Identification
| Field | Value |
|---|---|
| Change ID | CHG-[YYYY]-[XXXX] |
| Request Date | _________________________________ |
| Requestor Name | _________________________________ |
| Requestor Email | _________________________________ |
| Requestor Department | _________________________________ |
Section B: Change Classification
Change Type (select one):
| Type | Description | Approval Required | ☐ |
|---|---|---|---|
| Standard | Pre-approved, low-risk, routine | Pre-approved | ☐ |
| Normal | Planned change, known risk | Manager + CAB (if needed) | ☐ |
| Emergency | Urgent fix for outage/security | Emergency approval (post-doc) | ☐ |
| Major | High-risk, significant impact | CAB + Executive | ☐ |
Change Category (select one):
| Category | ☐ |
|---|---|
| Application / Code Deployment | ☐ |
| Database Change | ☐ |
| Infrastructure (Servers/VMs) | ☐ |
| Network / Firewall | ☐ |
| Cloud Configuration | ☐ |
| Security / Access | ☐ |
| Integration / API | ☐ |
| Other: _____________ | ☐ |
Section C: Change Details
Change Title:
_____________________________________________________________________________
Description of Change: (What is being changed?)
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Reason for Change: (Business justification)
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Affected Systems/Services:
| System/Service | Environment | Impact |
|---|---|---|
| Prod / Stage / Dev | ||
| Prod / Stage / Dev | ||
| Prod / Stage / Dev |
Section D: Schedule
| Field | Value |
|---|---|
| Proposed Start Date/Time | _________________________________ |
| Proposed End Date/Time | _________________________________ |
| Estimated Duration | _________________________________ |
| Maintenance Window | Yes / No |
| Downtime Expected | Yes / No |
| Downtime Duration | _________________________________ |
Section E: Risk Assessment
Risk Level (select one):
| Level | Criteria | ☐ |
|---|---|---|
| Low | Minimal impact, easily reversible, no customer impact | ☐ |
| Medium | Some impact, reversible, limited customer impact | ☐ |
| High | Significant impact, complex rollback, customer impact | ☐ |
| Critical | Major impact, difficult rollback, widespread impact | ☐ |
Risk Factors:
| Factor | Yes/No | Details |
|---|---|---|
| Affects production? | ||
| Affects customer data? | ||
| Affects security controls? | ||
| Requires downtime? | ||
| First-time change? | ||
| Complex dependencies? |
Section F: Implementation Plan
Pre-Implementation Steps:
| # | Step | Owner | Duration |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 |
Implementation Steps:
| # | Step | Owner | Duration |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 | |||
| 4 | |||
| 5 |
Post-Implementation Steps:
| # | Step | Owner | Duration |
|---|---|---|---|
| 1 | Verify change successful | ||
| 2 | Monitor for issues | ||
| 3 | Notify stakeholders |
Section G: Testing
Testing Completed:
| Test Type | Completed | Date | Tester | Result |
|---|---|---|---|---|
| Unit tests | Yes / No / N/A | Pass / Fail | ||
| Integration tests | Yes / No / N/A | Pass / Fail | ||
| Staging deployment | Yes / No / N/A | Pass / Fail | ||
| Security scan | Yes / No / N/A | Pass / Fail | ||
| Performance test | Yes / No / N/A | Pass / Fail | ||
| User acceptance | Yes / No / N/A | Pass / Fail |
Testing Evidence Location: ________________________________
Section H: Rollback Plan
Rollback Trigger: (What conditions would trigger rollback?)
_____________________________________________________________________________
_____________________________________________________________________________
Rollback Steps:
| # | Step | Owner | Duration |
|---|---|---|---|
| 1 | |||
| 2 | |||
| 3 |
Estimated Rollback Time: _________________________________
Rollback Verification: (How will we confirm rollback is complete?)
_____________________________________________________________________________
Section I: Communication
Stakeholders to Notify:
| Stakeholder | Pre-Change | During | Post-Change | Method |
|---|---|---|---|---|
| Customers | Yes / No | Yes / No | Yes / No | |
| Support Team | Yes / No | Yes / No | Yes / No | |
| Engineering | Yes / No | Yes / No | Yes / No | |
| Management | Yes / No | Yes / No | Yes / No |
Communication Message (Pre-Change):
_____________________________________________________________________________
_____________________________________________________________________________
4. Approval Section
Section J: Approvals Required
| Role | Required | Name | Approved | Date |
|---|---|---|---|---|
| Technical Lead | Yes | Yes / No | ||
| Security Review | Yes / No | Yes / No | ||
| Change Manager | Yes | Yes / No | ||
| CAB | Yes / No | Yes / No | ||
| Business Owner | Yes / No | Yes / No |
CAB Meeting Date (if required): _________________________________
Approval Notes:
_____________________________________________________________________________
_____________________________________________________________________________
5. Implementation Record
Section K: Implementation Results
| Field | Value |
|---|---|
| Actual Start Time | _________________________________ |
| Actual End Time | _________________________________ |
| Implemented By | _________________________________ |
| Implementation Status | Success / Partial / Failed / Rolled Back |
Implementation Notes:
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Issues Encountered:
_____________________________________________________________________________
_____________________________________________________________________________
Post-Implementation Verification:
- Change verified working as expected
- No errors in logs
- Monitoring shows normal operation
- Affected users/stakeholders notified
Section L: Change Closure
| Field | Value |
|---|---|
| Closure Date | _________________________________ |
| Closed By | _________________________________ |
| Final Status | Completed / Completed with Issues / Failed / Cancelled |
Lessons Learned:
_____________________________________________________________________________
_____________________________________________________________________________
6. Emergency Change Section
For Emergency Changes Only
Section M: Emergency Justification
| Field | Value |
|---|---|
| Nature of Emergency | _________________________________ |
| Business Impact if Not Implemented | _________________________________ |
| Verbal Approval Obtained From | _________________________________ |
| Verbal Approval Date/Time | _________________________________ |
Emergency changes require full documentation within 24 hours and review at the next CAB meeting.
7. Quick Reference: Change Categories
| Category | Lead Time | Approval | Examples |
|---|---|---|---|
| Standard | None | Pre-approved | Routine patching, scheduled jobs |
| Normal (Low) | 3 days | Manager | Minor feature, non-prod changes |
| Normal (Medium) | 5 days | Manager + Security | Config changes, dependencies |
| Normal (High) | 10 days | CAB | Database changes, architecture |
| Emergency | Immediate | Post-approval | Outage fix, security incident |
| Major | 10+ days | CAB + Exec | Major releases, migrations |
8. Attachments Checklist
- Technical specification
- Test results
- Rollback script (if applicable)
- Communication template
- Related tickets/issues
9. Related Documents
- Change Management Policy (POL-006)
- Secure Configuration Standards (PROC-003)
- Incident Report Form (TPL-003)
10. Version History
| Version | Date | Author | Changes |
|---|---|---|---|
| 1.0 | 2026-01-11 | IT Operations | Initial release |
This document is classified as INTERNAL. Unauthorized distribution is prohibited.